Qlogic QLogic 12000 Series Guía de instalación Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 134
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
1–Installation
Installation Tasks Checklist
D000140-001 D 1-5
Whether or not the UPS unit also provides online protection.
Installation Tasks Checklist
To perform the actual switch installation, the site implementation engineer must
perform the following tasks, which are detailed in this section.
1. Check the installation site to verify the installation of cabinet power feeds,
rails, and grounding.
2. Unpack the equipment and inspect for any shipping damage. Any shipping
damage should be reported to the shipping company.
3. Verify that the equipment shipped matches the packing list.
4. Mark the rack and install the mounting rails.
5. Physically install the switch in the rack.
Tools and Equipment Required
An ESD wrist strap
A #2 Phillips screwdriver
An M6 HEX nut wrench
Pen (felt-tip) to mark the mounting holes
Lifting device (e.g., pallet jack) for the 12800-360 and 12800-180
Check the Installation Site
The switches are designed to be installed in an existing server cabinet (not a telco
cabinet), where it can be mounted in a standard equipment rack.
Be sure of the following:
The cabinet has a full earth ground to provide reliable grounding.
There is enough room to work on the equipment.
The equipment will have enough clearance for front and rear access.
The IB cables can be accessed easily.
Water or moisture cannot enter the switch.
CAUTION!
Be sure to review the safety information before starting the installation and during the
installation process (refer to Appendix B.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 133 134

Comentarios a estos manuales

Sin comentarios